ZAHROOF VALVES INCREASE MTBF BY 7X

MIDSTREAM

Next Case Study
AMINE PLANT / SOUR GAS APPLICATION

ZAHROOF VALVES
INCREASE MTBF BY
7X

OEM valves are failing monthly at an amine plant of a large pipeline and midstream company. In addition to the issues of downtime, lost production, and increased labor and parts expenses— servicing the compressor was a major safety concern due to the presence of 30% sour gas.

StraightFlo™ Result

Since Jan. of 2019, StraightFlo™ Valves have operated without a single safety or maintenance incident— a 7X increase in mean time between failure (MTBF).

SINCE 2019 STRAIGHTFLO™ VALVES HAVE OPERATED WITHOUT A SINGLE SAFETY OR MAINTENANCE INCIDENT

Segment: Pipeline/Midstream
Location: East Ford Shale

Compressor: Ariel JG/4
Date Installed: June 2018