ZAHROOF VALVES UNPLANNED SHUTDOWNS
![ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Z_inside_logo-CS1.png?time=1721964635)
HYDROGEN, H2/NAT GAS MIX APPLICATION
ZAHROOF VALVES UNPLANNED shutdowns
![compressor repair, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Vector-Smart-Object.png?time=1721964635)
At a large US refinery, intermittent valve failures every three to six months are causing unplanned shutdowns. OEM valve life does not allow the compressors to run the full time between scheduled turnarounds every 2 years.
![Increase Annual Production, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/CLIPBOARD-SMART-OBJECT.png?time=1721964635)
STRAIGHTFLO™ VALVES MAXIMIZE REFINERY PRODUCTION.
![ZAHROOF VALVES UNPLANNED SHUTDOWNS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/ZAH-627_05_New_Website_CaseStudies_Downstream_Study3_C2-1.png?time=1721964635)
Segment: Large Refinery
Location: Upper Midwest
Compressor: Multiple
![ZAHROOF VALVES UNPLANNED SHUTDOWNS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Layer-47.png?time=1721964635)