ZAHROOF VALVES INCREASE RUN TIME FROM WEEKS TO YEARS
![ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Z_inside_logo-CS1.png?time=1721964635)
GAS GATHERING APPLICATION
ZAHROOF VALVES INCREASE RUN TIME FROM WEEKS TO YEARS
![compressor repair, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Vector-Smart-Object.png?time=1721964635)
High liquid and particulate contaminants are fouling the legacy plate valves of a large contract compression operator. Valves must be serviced monthly, resulting in lost production and increased maintenance costs.
![Increase Annual Production, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/CLIPBOARD-SMART-OBJECT.png?time=1721964635)
VALVE REPAIR FREQUENCY GOES FROM ONCE A MONTH TO ONCE IN THREE YEARS.
![Increase Run Time From Weeks to Years with Zahroof valves](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Layer-634.jpg?time=1721964635)
Segment: Contract Compression
Location: East Texas
Compressor: GE Gemini DS504
Date Installed: July 2013
![VALVES INCREASE RUN TIME FROM WEEKS TO YEARS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/ZAH-627_05_New_Website_CaseStudies_Midstream_Study1_C1-1.png?time=1721964635)