ZAHROOF VALVES MAKE OFFSHORE EASIER
![ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Z_inside_logo-CS1.png?time=1721964635)
GAS GATHERING APPLICATION
ZAHROOF VALVES MAKE OFFSHORE EASIER
![compressor repair, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Vector-Smart-Object.png?time=1721964635)
The legacy plate valves of an offshore E&P company are failing one to two times per week. Large numbers of spare valves must be kept on hand. Pulled valves must be transported to shore for machining.
![Increase Annual Production, valves operating without maintenance](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/CLIPBOARD-SMART-OBJECT.png?time=1721964635)
ZAHROOF VALVES OPERATE FOR APPROX. 4 WEEKS – A 6X INCREASE IN MTBF.
![compressor repair](https://hk2f2b.p3cdn1.secureserver.net/wp-content/uploads/2023/04/Layer-17.png?time=1721964635)
Segment: Offshore E&P Co.
Location: Gulf of Mexico (shelf)
Compressor: Ariel JGD/6 (shelf)
Date Installed: June 2020