ZAHROOF VALVES MAKE OFFSHORE EASIER

Upstream

Next Case Study
Gas Gathering Application

ZAHROOF VALVES MAKE OFFSHORE
EASIER

The legacy plate valves of an offshore E&P company are failing one to two times per week. Large numbers of spare valves must be kept on hand. Pulled valves must be transported to shore for machining.

StraightFlo™ Result

StraightFlo™ Valves operate for approximately 4 weeks —a 6X increase in MTBF.

On site servicing (with < 5% of modules being changed) eliminates the need to stockpile spares or transport valves to shore for repair.

Zahroof is continuing to collaborate with the customer to further extend valve life.

ZAHROOF VALUES OPERATE FOR APPROX. 4 WEEKS – A 6X INCREASE IN MTBF.

Segment: Offshore E&P Co.
Location: Dulf of Mexico (shelf)

Compressor: Ariel JGD/6 (shelf)
Date Installed: June 2020